Skip to content

How we choose.

A short list. A long horizon. Space first. Few names. Long conviction. No rented cores.

01

Start in space

The first screen is orbit. Launch, satellites, and the industrial system underneath. Everything else is judged against that standard of difficulty.

02

Own the stack

Prefer teams that design, build, and operate the critical layer themselves. If the core is rented, the company is a customer of someone else's moat.

03

Take the long road

We are comfortable with years of build-out. The companies that matter in this category do not look busy on a dashboard.

Where we look

01

Space

Launch, satellites, and the industrial system that turns orbit into a business. The first vertical.

02

Energy

Cells, packs, and the materials loop that feeds the vehicle — the other half of the stack.

03

Autonomy

Machines that move. Cars, aircraft, and factories designed as one closed system.

04

Intelligence

Models and interfaces that assume someone owns the hardware underneath.

Write Alex.

No deck required to start. A sentence about the machine you own is enough.

Alex@vertical-e.com